Update the City's Water, Wastewater (Sewer), Storm Drainage Facility, Parks, and Transportation System master plans every 5-10 years. * |
|
|
|
|
Develop and adopt a 5-year Capital Improvement Plan with a clear financial strategy to replace or upgrade the highest priority water, sewer, and storm drainage facilities. * |
|
|
|
|
Replace or upgrade water and sewer lines which are at the end of their useful life. Coordinate replacement with planned street and drainage improvement projects. * |
|
|
|
|
Update the City's public works design standards so they are consistent with engineering best practices. * |
|
|
|
|
New storm drainage standards will encourage on-site retention and detention, include water quality standards so the community minimizes pollution and discharges into local streams and waterways. * |
|
|
|
|
Design 1st Street as a welcoming, landscaped entry corridor from OR-22 to Main Street. * |
|
|
|
|
Relocate overhead electrical and telecommunications wires underground. * |
|
|
|
|
Prepare an emergency response and disaster recovery plan for the city and its residents. * |
|
|
|
|
Provide backup generators, fuel reserves, and emergency response so that basic city water and sewage treatment facilities can continue in operation during natural disasters. * |
|
|
|
|
The City embraces sustainability and new technologies. * |
|
|
|
|